Plumb it up with a builder s spirit level if desired backfill the hole and tamp the fill material to stabilize it.
Digging up old fence posts.
Here s a pretty simply method for removing a fence post seated in concrete all without digging or messing with complicated equipment.
Install the posts pole or other item for which you have dug your hole.
Build your one handed post puller.
There are a few ways you can do this such as.
Im going to show you a quick and easy trick.
Step 1 dig around the post until six inches of the concrete footing is exposed.
If you re following along with mike s method attach the 2 by material to the side of the post leaving.
Pull wooden fence posts set in concrete with no digging.
A concrete cinder block or scrap lumber or whatever you can find for a fulcrum.
Brush away loose dirt to expose the top of the concrete footing at the base of the post.
Drilling holes in the concrete and installing concrete lag bolts in the holes.
If the fence post has a large concrete base or is very firmly anchored in soil you may need to use a farm jack hi lift jack and chain to pull it out.
Take a moment to scrape away.
Plumb the post and install cross bracing on opposite sides to hold the plumb.
It is not easy.
Note this will require you to use a.
Step 2 wrap a chain around the concrete footing of the fence post.
This will require you.
How to remove a fence post the easy way tools for removing fence post footings.
Dig out soil around the post.
Use fine gravel tamped down to the bottom six inches 15 cm and set your post.
Wrapping metal wire around the base of the concrete and attaching the wire to the jack or digger.
Gather some simple materials.
Now take your steel chain.
Then set your post in place and use a level to ensure that it s perfectly vertical.
Have you ever tried removing a fence post that is cemented in.
Start out by digging a whole about.
To get started you ll need a way to get a bite on the post and something to apply pressure.
A posthole digger will make this easier.
To prepare for this dig out the soil around the post to a depth of 1 to 1 feet 0 3 to 0 46 meters.
2 loosen the upper layer of soil around the outer edge of the concrete footing using a digging bar.