The second and most likely being a basement flat is that the damp proof membrane in the slab floor has broken down allowing moisture to travel up through the slab and cause a problem.
Damp under carpet concrete floor.
The temporary fix was to rip up the carpet knock a hole in the concrete slab repair the leaking pipe fill in the hole with quickcrete cement and restretch the carpet once it and the pad had dried.
These problems are not only disrupting functions of the building due to maintenance operations but also costly.
Most damp proof floor coatings are applied directly to the concrete floor surface using a brush or roller.
This can cause issues with mold and mildew especially if you have carpet or.
If this is the case then the slab itself would need taking up a new damp proof membrane would need to be installed then a new concrete floor needs to be installed.
Concrete s porous nature means that water from under your home can seep up through your concrete floor making it damp.
It could also be bridging by the internal plaster or a failure of the wall floor joint.
Condensed moisture accumulation under the plastic at 16 hours can indicate a problem.
In this section we breakdown the main ways water can get into your concrete which causes a buildup of excess moisture and list effective methods to prevent moisture problems from occurring.
One of the simplest most economical test methods for determining whether there may be moisture in concrete is the astm d 4263 concrete moisture test.
It becomes a problem when the moisture levels are too high and water is transferred to the finishing layer above.
Damp rising through concrete floor slabs is fairly common when a damp proof membrane has failed or was not installed before the floor was laid.
The permanent fix will be to re plumb the house in pvc through the attic which will cost about 4000 and which i ll do next month.
I suggest you get an independent survey to pinpoint the problem before undertaking any remedial works.
Duct tape an 18 inch square piece of plastic onto the exposed concrete and leave it for 16 hours.
Sometimes the issue can be bridging of the damp proof course by the concrete floor assuming is was timber prior as this often occurs.
Which type of coating is chosen will depend on the intended use of the floor.